Next job was to clean out the cockpit area that had become a collection point for all manner of detritus.
This was cleaned out and washed down with some of that marine prep stuff.
Some of the powder coating on the chassis rails had started to lift and this has been scraped off and wirebrushed so that it can be treated to a coat of POR15.
All the seams were sealed using Sikaflex 221 to stop the weather getting into the joints. Once the sealant is dry, the interior can be painted.